Skip to product information
1 of 12

LeStyleParfait

Elite99 Shinny UV LED Soak Off Gel Polish Base Coat And Top Coat Gel 15ml

Elite99 Shinny UV LED Soak Off Gel Polish Base Coat And Top Coat Gel 15ml

Regular price Kshs. 800.00
Regular price Sale price Kshs. 800.00
Sale Sold out
Shipping calculated at checkout.
Color

Elite99 15ml Large Volume Top Base Coat Matte Shiny UV LED Soak Off Gel Polish Hot Sale Frosted Surface Matt Top Coat Gel

Brand Name: Elite99 
NET WT: 15ml 
Type: UV Gel 
Model Number: Nail Gel 
Quantity: 1pcs
Ingredient: Resin 
Item Type: Nail Gel 
Item: 15 ml Top Base Coat Matte Gel Gelpolish  
Cured: LED or UV Lamp 
Usage: for UV Nails/; Nail Art DIY; etc
Certificate: SGS/ MSDS/CE 
Package Include: 1pcs base/top coat or base top coat set 
Lasting Time: 3 Weeks or Above  

How to use:
Step 1. Clean Nails then trim nail surface as normal manicure process.
Step 2. Fully shake up the polish to balance the polish color (Important)
Step 3. Apply base coat first, dry it with UV lamp or LED lamp. (Necessary)
Step 4. Apply polish directly, dry it with UV lamp for 2-3 minutes or dry with LED lamp for 60 seconds; when dry, apply the 2nd layer and dry with it with UV lamp or LED lamp again.
Step 5. Coat with no clean top coat, which can make color more shinny, then dry with UV lamp or LED lamp. Coat with no clean matt top coat, which can make the nails have a matte effect, then dry with UV lamp or LED lamp.
Note: When coating with cleaning top coat/matt top coat, the final step is necessary. (Remove the tacky surface with cotton soaked with cleanser) 

 

To Remove: 
Step 1. Soak off the nails into acrylic remover for about 5 minutes,
Step 2. Rip down the whole piece of nail enamel gently on each nail.

Delivery 10-15 Days

We ship WORLDWIDE
Shipping to Kenya, Tanzania, Uganda takes 10- 15 working days.
Standard Shipping: 10-15 working days to EU and USA, other countries 10-15 working days
Free Shipping: 20-25 working days (All countries)

ORDER PROCESSING: 5-7 working days
Custom/tailor made products: Est. 10-15 working days (depends on the no. of orders).
Order Distribution: 1-3 Working Days.
*Estimated Delivery = Order processing + Shipping + Distribution
*The above does not include customs clearance delays
*working days = Monday to Friday

Questions, Need Help

If you have any queries regarding this product e.g. size, please do not hesitate to contact us.

WhatsApp: +254 792 426712

View full details
1 of 4